Quote Originally Posted by peterjim83 View Post
Awesome build. When you built the draft collars, how did you transfer the down into the blue sleeves?

Sent from my XT1049 using Tapatalk
I didn't. I merely split the 40" x 5" tube into the aforementioned 40" x 3" and 40" x 2" sections, and then slid them into the blue sleeves.

I didn't really want to mess with the down since I don't have any fancy shopvac attachment made yet for recovering down, and I knew the mess manually removing and transferring would create.