I have a question on this topic. Can I complete each half of the tarp with rolled hem, reinforcements, and loops before sewing the ridge line?
I want to add the side pulls and it would be easier to do before sewing the two halves together. I'd like to do all of it then the ridge line and ridge pulls last.
Bookmarks